EQUIPMENT DETAILS
ITEM'S DESCRIPTION
Advanced Photogrammetry System for Maximum Precision Industrial Measurement
Artec Metrology Kit Professional is a high-end optical coordinate measuring system developed for demanding industrial applications requiring the highest level of accuracy, repeatability, and volumetric precision.
Designed for advanced inspection, deformation analysis, aerospace and automotive engineering, and large-scale reverse engineering, the Professional version delivers metrology-grade performance with enhanced camera resolution and superior measurement accuracy.
This solution operates both as a standalone optical measurement system and as a high-precision referencing tool for Artec 3D scanners, significantly increasing volumetric accuracy over long distances.
Key Advantages
Ultra-High Precision Optical Measurement
• Point-based accuracy (RMS): up to 0.002 mm + 0.005 mm/m
• Length measurement accuracy (MPE):
0.015 mm + 0.015 mm × length (m)
• Enhanced volumetric accuracy when combined with Artec scanners
• Designed for high-repeatability industrial and metrology-grade tasks
The Professional version ensures maximum confidence in applications where even micron-level deviations matter.
Advanced Photogrammetry Workflow
• 30.3 MP digital camera (Canon EOS R)
• 28 mm AICON metric wide-angle lens
• High-resolution image acquisition for superior target detection
• Adjustable professional camera settings
• Optimized for complex and large-scale measurement projects
Using the Metrology Kit plugin inside Artec Studio, users can generate an ultra-precise target cloud and seamlessly integrate it with 3D scanning data for complete measurement and inspection workflows.
Standalone or Referencing System
The Professional version can be used as:
✔ A standalone 3D optical coordinate measuring system
✔ A high-precision volumetric referencing tool for Artec scanners
✔ A deformation and structural analysis solution
✔ A measurement system for large and complex assemblies
✔ A precision enhancement solution for long-range 3D scanning
Photogrammetry data from the Professional version dramatically reduces accumulated error over distance and allows smaller field-of-view scanners to measure large objects with exceptional volumetric accuracy.
Portable & Industrial-Ready
• Rugged transport case
• Designed for workshop, factory, and field environments
• Suitable for unstable or dynamic conditions (dynamic referencing support)
• CE-compliant measurement system
• Built for high-demand industrial applications
The system is fully portable and engineered for reliable operation in production facilities, offshore environments, aerospace sites, and research laboratories.
What’s Included – Professional Version
• 30.3 MP digital camera (Canon EOS R)
• 28 mm AICON metric wide-angle lens
• Metrology Kit plugin for Artec Studio
• Adjustable professional camera settings
• Extended set of measurement targets
• Separate reference cross for complex and larger objects
• Scale bars for high-accuracy measurements
• DAkkS certificate for the complete measuring system
• Rugged transport case
Applications
The Professional version is ideal for:
• Aerospace structural analysis
• Automotive R&D and production inspection
• Offshore and heavy industry measurement
• Deformation and load analysis
• Large-scale industrial inspection
• Reverse engineering of complex assemblies
• Infrastructure and mechanical system verification
• High-precision manufacturing validation
Why Choose the Professional Version?
✔ Maximum metrology-grade accuracy
✔ Superior volumetric precision over long distances
✔ Advanced camera system for demanding environments
✔ Ideal for complex and large-scale industrial projects
✔ Seamless integration with Artec Studio and 3D scanners
✔ DAkkS-certified optical measurement system
✔ Designed for critical, mission-sensitive applications








